Implementation:

  • Industrial wastewater treatment plant together with the waste management system for technology of synthetic fuels production from ethanol located in Bogumiłów, Kleszczów municipality, based on the technology developed by S. Fudala-Książek and A. Łuczkiewicz

  • Modernization of wastewater treatment plant for oil pipeline operating company PERN Przyjazń Ltd. located in Gdansk, based on technology developed by S. Fudala-Książek and A. Łuczkiewicz

  • Installation for the sulfides removal from landfill leachates generated on the Municipal Solid Waste Plant Nowy Dwór Ltd. (Nowy Dwór 35, 89-620 Chojnice), based on the technology developed by S. Fudala-Książek, K. Mazurkiewicz, A. Łuczkiewicz, E. Kulbat

  • Removal of arsenic from underground water captured for the Bury Miś Community Foundation of B. Jański, Wętfie 1, Nowy Klincz, 83-400 Kościerzyna, Pomeranian Voivodeship. The treatment plant with a capacity of approx. 10 m3/day put into use in 2014 based on the technology developed by R. Bray

  • Installation on the premises of Utilizing Factory, LLC in Gdańsk to remove sulphides from the permeate produced in the reverse osmosis system. Authors S. Fudala-Książek, E. Kulbat, A. Łuczkiewicz